Pusat KendaliRingkasan operasi seluruh site
Site Sebamban ▾
Shift Shift 1 ▾
—
${ic('bell')}
Alert Aktif
Status Waktu Armada — Shift 1 (06:00–18:00)
WorkingStandbyRepair
Device Health
Alert Log
Availability per Unit
Formula LFN: PA = (W+S)/(W+S+R) · UA = W/(W+S) · MA = W/(W+R) · EU = W/(W+S+R). Klik baris untuk drill-down unit.
Loss Analysis
Tren PA — 14 hari
▲ +2.3%12 Jun19 Jun26 Jun
Timeline W/S/R — DT-114
Sensor
Working
Standby
Repair
06:0009:0012:0015:0018:00
Klasifikasi otomatis · sinyal GPS & ignition (ACC) · hover segmen untuk detail
Rekap Waktu
KPI Availability
Siklus Hauling per Ritase — DT-114
Pit ROM-3 → Port Sebamban · 8,4 km
LoadingLoaded Haul
QueueDumpingEmpty Return
RATA-RATA Cycle Time per Ritase
Deteksi Anomali
Queue tinggi Rata-rata antri port 14 mnt (target < 8)
Ritase Rendah Ritase pada DT-203 dibawah rata-rata (actual = 3 vs target < 9)
Ritase lambat DT-203 & DT-061 avg cycle > 66 mnt
Produktivitas Fleet — Shift 1
Event DMS — Shift 1
Bukti Video · Event —
HIGHCH3 · DMS (kabin)
REC
${ic('play')}
— · —
Event tertaut klip video + telemetry saat kejadian. Hanya klip event yang disimpan (bukan rekaman penuh) → hemat storage.
Driver Scorecard — Shift 1
Pembuat Laporan
Role
Foreman
Officer
SPV Operasional
Jenis Laporan
Metrik
Periode
Format laporan mengikuti template resmi LFN/Jhonlin. Ekspor PDF & Excel.
Laporan Terjadwal
Shift Activity Report
W/S/R per unit · Alert aktif · Status breakdown
Tiap akhir shift
→ Foreman
Daily Production Report
Ritase · Tonase · UA · Avg Cycle — per unit
Tiap hari 18:30
→ Officer
Availability & Kinerja Shift
PA/UA/MA/EU · Tonase · Event DMS
Tiap hari 18:30
→ SPV Operasional
Weekly HSE Summary
Event DMS · Driver Scorecard per shift
Senin 07:00
→ SPV, HSE
Pratinjau · Availability & Kinerja Shift · SPV
SITE SEBAMBAN · SHIFT 1 · 26 JUN 2026
PA 90.3% · UA 80.4% · MA 87.8% · EU 72.9%
Tonase 5.400 t · Event DMS: 8
Unit di bawah target UA: DT-203 (66.7%)
PA 90.3% · UA 80.4% · MA 87.8% · EU 72.9%
Tonase 5.400 t · Event DMS: 8
Unit di bawah target UA: DT-203 (66.7%)